CN truck spécial equipment to repair urgent defect on the tracks in this case they repair the level of the track taking oof the nails and lift the track and fill in under rock to level the track and add wood pieces in hole to replace nails in before check with mesure tape if the track are at 56inches1/2 between the two track |
Date:
5/23/2011 |
Location:
St-Lambert, QC CA |
Views:
375 |
Collection Of:
JEAN-PIERRE BROSSARD |
|
Author: JEAN-PIERRE BROSSARD
|
|
Picture Categories: Track,Action |
This picture is part of album: mtl®ions trains photos |