22K with run-through NS power rounds the curve at Zoar past the newly-activated signal at MP 411         
Those are LED elements in the signal, which makes it extra bright /visible from a distance
Date: 10/26/2013 Location: Zoar, MA Views: 146 Collection Of:   Bob Krug
Locomotives: NS 9645(C40-9W) NS 9362(C40-9W) NS 9848(C40-9W)    Author:  Bob Krug
22K with run-through NS power rounds  the curve at Zoar past the newly-activated signal at MP 411
Picture Categories: Scenic,Signal,Action This picture is part of album:  Pan Am Railways in the Deerfield River Gorge
Share
User Comments No Comments on this picture
Add a Comment:  
Please Log in to leave a Comment.  
Link to this page: http://www.rrpicturearchives.net/showPicture.aspx?id=3672977